RFP & proposal software for construction

All your construction documents, a prompt away.

One platform to generate every document in a construction deal, from the go/no-go analysis to the technical brief, proposals, and contracts. Each one is built from your own knowledge base, so it comes out complete, consistent, and in the buyer's format.

Try for free
Export to Word, PDF or PPT
Free to start
Trusted by Altrad
The problem

Five problems every construction team knows

Time-consuming document work

A technical brief takes days to write. Supplier forms ask for the same company information over and over. Add the tables and annexes, and answering one tender can eat a full week.

Quality depends on who wrote it, and when

Different people write different parts of the same response, each in their own way. Some sections get a full day, others get an hour at the end. The result is one bid where the quality changes from page to page, and the buyer notices.

Lack of time means fewer opportunities to bid on

Writing a bid takes time nobody has. Projects come first, so tenders pass unanswered and the less you bid now, the less work is lined up next. The opportunities are there, yet the time to answer them isn't.

One missing detail costs points

Details matter more than ever. If a requirement isn't answered or a box isn't filled, your score drops even when the work behind it is good.

Buyers impose their own frame

Every buyer decides how your response has to look. Public tenders come with an imposed structure; big clients each send their own forms and formats. So even when the content already exists from a past bid, someone has to take it apart and rebuild it to fit the new frame.
How it works

How Cobl helps win your deals

Upload the tender, connect your documents, and Cobl generates each piece of the response, in the buyer's format, ready to review and send.

1

Feed in your tender documents

Drop in the tender documents. Cobl reads through them and lists what the buyer is actually asking for, requirement by requirement. You know within minutes whether the tender is worth answering.

2

Upload your references and past methods

Past responses, project references, certifications, upload them one time. This is what Cobl writes from. Every future bid draws on the same base, so nothing has to be dug up or rewritten again.

3

Cobl generates the full response

Cobl generates the full response. The technical brief, proposal, using your own content, in the structure the buyer imposes, with every requirement covered. Not a construction template with blanks to fill: a complete draft, written from your actual projects and methods.

4

Review, refine & export

Edit directly and export to PDF, or Word and PowerPoint, fully editable.

Teams that answer more tenders with Cobl

See how CERAP Prévention responds faster without losing quality

Consulting

“I used to spend three days analyzing a major tender,” says Eric. “With cobl, the analysis and synthesis are done automatically, I can now focus on what really matters: how CERAP can best respond to the client.”

Eric Henon

Director of Subsidiaries and Development

Portrait of Eric Henon from Cerap Prevention, a Cobl customer.

FAQs

Quick answers to help you get started with cobl

How much does Cobl cost? What plans are available?

Cobl offers three plans: Free, Pro, and Team. The Free plan lets you sign up instantly with no credit card required and generate around 5 documents, enough to test Cobl on a real tender response before committing. The Pro plan increases your capacity to around 15 documents, suited to teams responding to tenders regularly. For construction firms handling bids at volume or needing custom setup, the Team plan is tailored to your workflow. Book a call with our team to discuss your needs.

Is it safe and efficient to use AI for complex construction project documentation?

Yes, provided the AI platform is built with security and data control at its core, which is exactly how Cobl is designed. On the efficiency side, the gains are real: teams cut technical brief drafting from days to hours because most of any tender response already exists in past bids. On the security side, Cobl protects your data with AES-256 encryption at rest, TLS 1.2+ in transit, and 24/7 monitoring with automated alerts. Your documents are never used to train AI models, no fine-tuning, no data reuse, no hidden training, and Cobl only selects LLM providers that commit to no training or fine-tuning on your inputs. For construction firms handling confidential project data, Cobl also offers flexible deployment in sovereign, private, or on-premise clouds, including hosting directly in your own AWS or Azure tenant or running fully inside your infrastructure with no internet connection required. AI does the assembly; your experts keep control of validation and final review.

How do you write a construction proposal?

To write a construction proposal, structure it in six parts: project understanding, technical approach, team and references, timeline, pricing, and compliance documents. Start by restating the client's requirements in their own terms, evaluators score relevance, not length. Then detail your methodology, safety measures, and comparable past projects. The fastest way to do this consistently is to reuse validated content from previous winning bids rather than writing from scratch: most of a strong proposal already exists in responses you've written before.

What's the best platform for pulling data into construction quotes with flexible file formats?

Cobl pulls data from your past documents, CRM, and uploaded files into construction quotes and proposals, and exports to Word, PowerPoint, or PDF depending on what the tender requires. Tenders rarely accept a single format. You might need a PDF technical brief, Word-based supplier approval forms, and an editable pricing annex. A platform that reads and outputs multiple formats saves the reformatting hours that usually happen the night before a deadline.

Which software helps build construction project responses while linking to existing contact lists?

Cobl builds construction tender responses and proposals while connecting directly to your CRM, so client details, contacts, and deal context flow into every document automatically. Instead of copy-pasting company names and project references from a spreadsheet, your response pulls the right client information from the systems you already use, reducing errors on the administrative forms where a wrong detail can disqualify a bid.

What is an RFP in construction?

An RFP (request for proposal) in construction is a formal document a client or public body issues to invite contractors to bid on a project, detailing the scope, technical requirements, timeline, and evaluation criteria. Most construction RFPs require a technical brief, pricing documents, and administrative forms. Responding well means proving both technical capability and reliability, which is why RFP responses are among the most time-consuming documents construction teams produce.

Every proposal and RFP response, built to win.

Every document your deal needs built from the actual deal.

Cartoon document mascot wearing sunglasses and waving, used as a friendly greeting or sign-off.